翻訳と辞書
Words near each other
・ Kerr effect
・ Kerr Grant
・ Kerr Hall
・ Kerr House
・ Kerr Inlet
・ Kerr Lake
・ Kerr Lake State Recreation Area
・ Kerr metric
・ Kerr Mill
・ Kerr Neilson
・ Kerr Place
・ Kerr Point
・ Kerr Scott Farm
・ Kerr Smith
・ Kerr Stuart steam railmotor
Kerr Sulphurets Mitchell
・ Kerr Township, Champaign County, Illinois
・ Kerr Whiteside
・ Kerr's Atlantic tree-rat
・ Kerr's Building
・ Kerr's Miniature Railway
・ Kerr's noctuid moth
・ Kerr's Patent Revolver
・ Kerr's Pink
・ Kerr's sign
・ Kerr, Montana
・ Kerr, Ohio
・ Kerr, Stuart and Company
・ Kerr-lens modelocking
・ Kerr-McGee


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Kerr Sulphurets Mitchell : ウィキペディア英語版
Kerr Sulphurets Mitchell
Kerr-Sulphurets-Mitchell (KSM) is an active mine exploration project 65 km northwest of Stewart, British Columbia (1,545 km northwest of Vancouver, British Columbia).〔(【引用サイトリンク】title=Kerr-Sulphurets-Mitchell Project Project Description )〕〔(【引用サイトリンク】title=KSM (Kerr-Sulphurets-Mitchell) Project - Public Comment Invited on Proposed Scope of the Environmental Assessment )〕 The property is 100% owned by Toronto-based Seabridge Gold. Denver-based royalty company Royal Gold owns a 2% net smelter return royalty on the mine. Since May 2011 the project has also been called Kerr-Sulphurets-Mitchell-Iron Cap due to the addition of significant reserves from the Iron Cap region.
When operational it will feature three open pit mines, a processing plant and a tailings facility.〔(【引用サイトリンク】title=KSM Project )〕 It is the largest undeveloped gold deposit in Canada and one of the world's biggest copper-gold porphyry deposits.〔(【引用サイトリンク】title=American Creek Sees Gold in Seabridge's Plans )〕〔(【引用サイトリンク】title=Seabridge sells royalty option on massive KSM project to Royal Gold )
Though 2P reserves are significant (39 million ounces of gold, 214 million ounces of silver, 9.9 billion pounds of copper and 257 million pounds of molybdenum) they only represent about 65% of the mine's total resource of each metal.〔〔(【引用サイトリンク】title=Golden plans coming together in BC for Pretium )〕〔(【引用サイトリンク】title=Seabridge Gold Inc 2010 Annual Report )〕 The mines have a 52 year mine life (up from the 37 year estimate in 2009) and in the first seven years gold production costs are estimated to be $105/oz.〔 Environmental/geological assessment was done by Rescan and Wardrop (other Rescan projects include Pueblo Viejo and Ekati).〔 All of the proven reserves and 75% of the proven + probable reserves are in the Mitchell Valley. Although the area's pyritic gossans have been clearly visible for a while, mining has never been attempted before.〔(【引用サイトリンク】title=Kerr-Sulphurets-Mitchell: GEOLOGY )
It neighbors Pretium Resource's Snowfield project (previously owned by Silver Standard Resources). Snowfield has reserves of 25.9 million ounces for gold, 3 billion pounds for copper, 75.8 million ounces for silver and 258.3 million pounds for molybdenum.〔 Barrick Gold's Eskay Creek Mine is 20 km northwest of KSM.〔
Image description: The map to the right shows the boundary between the KSM property and Pretium Resource's Snowfield-Brucejack project and the road connecting them to Barrick Gold's Eskay Creek mine]. The large land impressions that can be seen running through the Kerr and Sulphurets properties are glaciers (Sulphurets Glacier, Mitchell Glacier), icefields and lakes (Brucejack Lake is to the right just outside the area shown). More detailed representation here ().
==History and background==

The property was purchased by Seabridge Gold in 2000 from Placer Dome (currently Barrick Gold) and exploratory activity began in 2006. Since then exploration by Seabridge has added about 20 million ounces of gold resource.〔
A preliminary feasibility study released in May 2010 increased reserves by 61% for silver (133 million ounces), 42% for copper (7 billion pounds), 27% for gold (8.5 million ounces) and 22% for molybdenum;〔(【引用サイトリンク】title=Seabridge Gold’s huge KSM project in northern BC can make gold for $105/oz )〕 Most of the new reserves came from the Iron Cap portion of the property which wasn't part of previous development plans.
Exploration spending in British Columbia was $521 million in 2008 and 2009 combined with spending in 2009 being the "6th highest total in the last 20 years". Besides KSM there were 87 other significant exploration projects in BC that year (60% of the companies involved were based in BC).〔(【引用サイトリンク】title=Officials believe one of the largest gold resources in the world lies within BC )
In 2010 a comprehensive environmental assessment of the area was completed by Canada's ministry of environment. While the study was being done the Canadian Environmental Assessment Agency (CEAA) was undergoing a review of its own by the Supreme Court of Canada.〔(【引用サイトリンク】title=Supreme Court Decision on Red Chris Mine Project - Impact on Federal Environmental Assessments )
KSM is located near the headwaters of a tributary of the Unuk River, which flows into Behm Canal near Ketchikan. Seabridge unveiled its development plan during a public meeting in Ketchikan in October 2011 before a crowd of skeptical residents.〔http://www.alaskapublic.org/2011/10/06/bc-coal-mine-plan-irks-ketchikan-residents/〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Kerr Sulphurets Mitchell」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.